Marysville Waste Water Treatment Plant

Location: Marysville, Ohio

Project Owner: City of Marysville

2005-2008

This three year new build was one of the largest that Claypool Electric had performed up to that time.  The site development included over 100,000 feet of underground conduits in over 10,000 feet of lineal trench.  Systems installed included:

• A UV Sterilization System
• Extensive PLC control system
• 5 KV Switchgear lineup
• 750 KV generator
• 23KV service entrance

Claypool Electric was pleased to be able to leverage our extensive manpower and expertise in management and the electrical trade to make sure that this large scale project was delieverd on time and in budget.
 
  