Renewable Energy


Hocking College Energy Institute

 
 
 
    
 
Hocking College
Logan, OH
 
  • LEED Platinum Certified.
  • Installed Electric Car Charging Stations.
 
 
Beightler Armory Solar Array
 
 

Ohio Army National Guard
Columbus, Ohio
 
  • 75 Kilowatt Solar Array.
  • Estimated to produce 135,000 Kilowatt hours of electricity in the first year at a savings of $11,600.
  • Will feed energy back into the electrical grid on a yearly basis.
  • The previous consumption of the armory was equal to releasing 130,500 pounds of carbon dioxide into the atmosphere each year. Driving 144,610 miles in an average car would release the same amount.
  • The Ohio National Guard would have had to plant 326 trees yearly to offset the same amount of emissions.
 
 
Evening Street Elementary
 
 
       

Worthington City School District
Worthington, Ohio
 
  • 68 Kilowatt Solar Photovoltaic System.
  • This system will produce enough electricity to power 23 homes.