Claypool Electric Social Media



Follow Claypool Electric
740.653.5683
Claypool Electric
Health Care
K-12
Higher Education
Water/Wastewater
Industrial
Medium Voltage
Special Projects
Design Build
Voice/Data
Renewable Energy

Medium Voltage


Southerly Waste Water Treatement Plant


DSC_0008 DSC_0034
DSC_0030 DSC_0033


City of Columbus
New Raw Sewage Pump and Grit & Screen Buildings
Overhead Primary Power Modification and Upgrade

  • Installed new 14,400 volt primary overhead service for extension of existing primary north loop. (Approximately 700 feet of 1351 MCM 3 phase line)
  • Terminated cables with dead end insulators.
  • Tied in 1000 MCM at riser poles with 12 heat shrink terminations.
  • Installed new poles and built new 3 phase line.
  • Installed new group operated air brake switch.
© Copyright 2017 Claypool Electric. All Rights Reserved. | Site Crafted by: Robintek - Columbus Website Design